After the production of the chain furnace equipment provided by Zhengzhou Dingli to the Moroccan customers, we arranged the delivery for the customers as soon as possible. The following is the delivery site of the chain furnace equipment.
Equipment composition
Combustion furnace, coal loading machine, slag remover, blower, reducer, high temperature flue gas multi-stage purification room, powerful exhaust fan, exhaust pipe, high temperature fast gate valve, air distribution door, dust cleaning door.
Working principle
The fuel coal is lifted to the coal storage hopper in front of the furnace by a bucket elevator. With the slow rotation of the grate, the fuel coal automatically enters the furnace. According to different fuel types, the front arch and the rear arch are adapted in the furnace. The scientific combination of the front and rear arches ensures that the coal entering the furnace can be burned in time and fully. A secondary combustion chamber is set above the front and rear arches to ensure the full combustion of coal and improve thermal efficiency. At the same time, it is set in the secondary combustion chamber. Multiple flue gas partition walls were installed, so that during the flow of the flue gas, after a number of impacts and turns, the smoke and dust settled. The burned slag enters the tail slag remover and automatically discharges the furnace with the rotation of the grate.
Since its establishment, Zhengzhou Dingli, after years of hard work and hard work, has not only become a well-known brand in the domestic dehydration and drying industry, but also promoted heat source equipment, drying equipment, dehydration equipment to the world.
We will give you customized Proposal & Quotation within 24 hours.